The floor joists are down

Today was the second loft payment. The guys have been great and have just finished cutting and laying the floor joists. All the metalwork is now bolted into place too. The speed of the next stage hinges on the weather as it needs to be dry because they will start knocking out the roof to accommodate the dormer.

The weather couldn’t have been worse on Sunday and Monday. We had high winds and torrential rain. Unfortunately the tarpaulin covering the hold in the roof was not up to the job and we had some leaks in the spare room and though to the kitchen. Now there are unsightly brown stains on the ceilings of both rooms.